Your Bathroom. Remodeled in 7 Days. Guaranteed.
Materials staged before Day 1. Dedicated crew. Fixed price. Zero surprises.
How the 7-Day Bathroom Works
Design & Selections
Every tile, fixture, vanity, and fitting is selected and approved before we schedule your start date.
Materials Staged in Advance
All materials arrive at your home before Day 1. Your bathroom is torn out and rebuilt without a single supply delay.
Dedicated Crew, Rapid Install
One crew, your project, seven days straight. No shared schedules, no gaps between trades.
Final Walkthrough
On Day 7 we walk every detail with you. Grout lines, fixtures, finish — everything perfect before we leave.
$5,000 back.
For every day we run over 7. In writing. No exceptions.
2-Year Craftsmanship Warranty
If our work fails within 2 years, we fix it free. No questions.
Get Your 7-Day Bathroom Estimate
Takes about 2 minutes. No commitment required.
Free Remodeling Estimate Tool
Powered by SD General Design & Construction
SD General
Would you like a rough estimate for your 7-day bathroom remodel? We'll just ask a few quick questions so you can get an idea of what you're looking at.
Common Questions
Can you really complete a bathroom remodel in 7 days?
Yes. Our pre-construction process is what makes it possible — every material is on-site before Day 1, permits are pulled, and a dedicated crew works the project straight through. Seven days is our contractual commitment.
What counts as Day 1?
Day 1 is the first day our crew begins physical work at your home. Design, selections, permitting, and material staging all happen before the clock starts.
What happens if you go over 7 days?
$5,000 back for every calendar day past Day 7. Written into your contract with no exceptions.
Want to read more about how this works?
Read the full 7-Day Bathroom Remodel guide →