ADU, Granny Flat & Mother-in-Law Suite Contractors in San Diego

We build granny flats, detached ADUs, attached mother-in-law suites, and garage conversions — fully permitted and built to last. Design, engineering, permits, and construction handled start to finish.

ADU Construction That Solves Your Problem

Select the situation that sounds most like yours. We'll show you a real project where we solved the same problem.

What It Costs and Why

Garage Conversion

$120K – $180K

Detached ADU

$180K – $350K+

Timeline

3 – 5 Months

Top Cost Drivers

  • ADU type (detached vs. attached vs. garage conversion)
  • Utility connections (water, sewer, electrical)
  • Site access and grading requirements
  • Foundation type and soil conditions
  • Size and finish level
  • Impact fees (ADUs 750 sq ft and larger)

How It Works

A straightforward process designed around transparency and zero surprises.

1

Free Consultation

We visit your home, listen to your goals, assess the space, and discuss budget. No pressure, no obligation.

2

Design & Plan

We create a design with layout options, material selections, and a detailed, line-item proposal with locked pricing.

3

Build & Deliver

Construction begins with daily cleanup, weekly photo updates, and a final walkthrough backed by our 2-year warranty.

ADU Types We Build

California law allows most single-family lots in San Diego to add at least one ADU. The right type depends on your lot, budget, and goals.

Granny Flat Construction

A granny flat — also called a detached ADU or backyard cottage — is a fully separate structure on your lot with its own foundation, utilities, kitchen, bathroom, and private entrance. It's the most popular ADU type in San Diego and the strongest option for rental income or long-term family use. We build granny flats from the ground up, including design, engineering, and all permits.

Mother-in-Law Suite

A mother-in-law suite (or in-law suite) is an attached addition to the main home with a private entrance, bedroom, bathroom, and kitchenette. It shares one or more walls with the primary residence. This is the right choice when the lot is tight, when privacy matters but separation isn't required, or when the goal is multigenerational living over rental income. We design and build in-law suites with ADA-accessible features on request.

Garage Conversion

Converting an existing attached or detached garage into a living unit. The most cost-effective ADU option — no new foundation required. Permitted under the same state streamlining rules as new ADU construction.

Junior ADU (JADU)

Up to 500 sq ft carved out of the primary home's footprint — typically a converted bedroom with a kitchenette. Lowest cost option. Can share an entrance with the main home.

San Diego ADU Rules

California state law has significantly streamlined ADU permitting. San Diego follows state law, which overrides older local restrictions.

Key State Law Protections

  • 4-foot minimum side and rear setbacks — cities cannot require more
  • No owner-occupancy requirement (AB 3182)
  • No parking required for ADUs within ½ mile of transit
  • Impact fees waived for ADUs under 750 sq ft
  • City must approve or deny within 60 days
  • Most single-family lots can add one ADU plus one JADU

Coastal Zone Considerations

Properties in La Jolla, Del Mar, Encinitas, and Solana Beach fall within the Coastal Overlay Zone, which requires a Coastal Development Permit in addition to standard ADU approvals. This adds 4–8 weeks to the permit timeline. We manage both applications.

Get a Real-Time Estimate for Your ADU Construction

Answer a few quick questions about your project and get a personalized cost range in minutes. No email required to start.

Get Your Free Estimate

Frequently Asked Questions

Answers to the questions we hear most from San Diego homeowners considering an ADU.

A granny flat is a self-contained living unit on the same property as the primary home — typically a detached backyard structure with its own kitchen, bathroom, bedroom, and private entrance. In California, granny flats are legally classified as Accessory Dwelling Units (ADUs). The term 'granny flat' is informal but widely used. In San Diego, state law has streamlined ADU permitting significantly, making granny flats one of the most practical ways to add rental income or multigenerational housing to your property.

Most single-family lots in San Diego qualify for at least one ADU (granny flat) under California state law. The main requirements are: the lot must be zoned residential, the primary structure must already exist, and the ADU must meet minimum setbacks (4 feet from rear and side property lines for detached ADUs). Coastal overlay zones in La Jolla, Del Mar, and Encinitas have additional permit requirements. We assess your specific parcel during the free consultation to confirm what's allowable.

A granny flat (detached ADU) is a completely separate structure on your lot with its own foundation, utilities, and outdoor space. A mother-in-law suite is an attached addition to the primary home — it shares a wall with the main house but has a private entrance, bedroom, bathroom, and kitchenette. Granny flats offer more separation and are preferred for rental use; mother-in-law suites are more cost-effective and suited for multigenerational living.

A detached granny flat (ADU) in San Diego typically costs $150,000 to $250,000 for a 400–600 sq ft unit. Larger or more premium units can reach $300,000+. Key cost factors include size, utility connection requirements, site access, and finish level. Garage conversions start lower ($120,000–$180,000) because no new foundation is required. We provide a fixed-price proposal after a site assessment — no open-ended estimates.

Our Price Lock Guarantee means your proposal price is locked to the signed scope of work. The only thing that changes the price is a written change order that you initiate and approve. For ADUs, we complete thorough site assessment and utility evaluation before pricing so the proposal is accurate.

ADU construction in San Diego ranges from $120,000 for a garage conversion to $350,000+ for a large detached ADU with high-end finishes. Detached ADUs typically cost $180,000–$300,000. Key cost factors include size, utility connection requirements, site access, and finish level.

Construction takes 3 to 5 months depending on ADU type and complexity. Design and permitting add 2 to 4 months before that — the City of San Diego is required to process ADU permits within 60 days, though plan for 60–90 days in practice. Total project timeline from kickoff to move-in is typically 5 to 9 months.

No. California state law (AB 3182) eliminated the owner-occupancy requirement for ADUs. You are not required to live in the primary home or the ADU. You can build, rent both units, and be off-site.

It depends on your goals. Garage conversions are less expensive ($120K–$180K) and faster to permit because no new foundation is required, but they sacrifice parking and tend to be smaller. Detached ADUs cost more ($180K–$350K) but offer complete separation, more design flexibility, and are typically more attractive to renters and appraisers.

California state law sets a 4-foot minimum side and rear setback for new detached ADUs — San Diego cannot require more. Maximum size is 1,200 sq ft for a detached ADU under state law. Junior ADUs (JADUs) within the existing home can be up to 500 sq ft. Height limits are typically 16 feet (18 feet within half a mile of transit). Coastal overlay zones in La Jolla, Del Mar, and Encinitas have additional review requirements.

Ready to Add an ADU to Your Property?

Schedule a free consultation. We'll assess your lot, walk through your options, and give you realistic numbers with no pressure.

CallTextFree Estimate